Helsinki Olympic Stadium re-inaugurated after extensive renovation

Helsinki Olympic Stadium has reopened following a four-year project to rebuild and modernise the venue.

Image: Wellu Hämäläinen
Image: Wellu Hämäläinen

First inaugurated in 1938, the renovation respects the stadium’s original modernist architecture, which introducing new functions to meet 21st century standards for a multipurpose arena. As a result, the stadium is more comfortable, accessible and functional while remaining instantly recognisable. 

The entire stadium has been modernised, including the stands, pitch and tracks. while another stadium has been built underground: 20,000 square metres of new underground space doubles the amount of warm indoor space at the Stadium. Versatile sports facilities, a tunnel following the tracks above, a logistics area and a multipurpose hall constitute a completely new part of the Olympic Stadium.

The stadium’s external architecture of 2020 combines the restored 1930s concrete architecture and the renovated parts of the 1950s with a new North stadium square, where food and beverage kiosks in concrete serve audiences. 

The architectural design is by the consortium K2S and NRT in cooperation with Swedish architecture collective White Arkitekten and Wessel de Jonge from the Netherlands.

“The Olympic Stadium was built for action, and it has a wide range of different user groups. The Stadium offers a frame for all this action. As architects, we had to listen to representatives of all the different user groups, learn about their needs, and fit them together in a way that allows the stadium to serve all users with as little changes as possible – all the while maintaining an architecturally harmonious, experiential stadium,” says architect Kimmo Lintula from architecture office K2S.

Related Stories
Newcastle City Pool redevelopment completes
Leisure, design and build specialist, Createability, has put the finishing touches to a £7.5m redevelopment of Newcastle City Pool and Turkish Baths, sensitively transforming the 1920s building into a fit-for-purpose leisure hub.
£4.2m leisure centre revamp completes in Merseyside
The £4.2m redevelopment of Newton Le Willows Health & Fitness, Merseyside has completed to realign the facilities and services to the needs of the local community.
Praise for ‘move Urmston’ following £7m investment
The £7m redevelopment of Trafford Leisure’s Urmston Leisure Centre has earned praised for its innovative design and sustainability by RIBA (Royal Institute of British Architects).
£4m redevelopment project underway At Thirsk Leisure Centre
Work has started on the revamp of Thirsk Leisure Centre. Once complete, the centre's gym will be three times the size of the current facility and will operate 24 hours a day, seven days a week.
Works complete at Crystal Leisure Centre
A 25m swimming pool at Crystal Leisure Centre has re-opened to swimmers ahead of re-opening of the site's leisure pool and the return of free swimming sessions for children.

Login / Sign up